Tailored technology and expertise for EGL

Let's talk about Eastern Green Link

Enable higher levels of
construction performance

For Eastern Green Link, precision and efficiency are key, there is little room for error, when attaining the UK’s decarbonization targets are at stake. Elevate your operations with Thinkproject's highly configurable software solutions designed to seamlessly navigate every phase of the construction lifecycle. From planning and construction to handover, our suite of solutions helps you:

  • gain full oversight over the field operation

  • enhance collaboration between the office and the construction sites

  • ensure data accuracy

  • see data in a context

  • automate reporting


Thinkproject Use Cases

Design & Permit
  • Initial Design (2D and 3D)

  • Detailed Design (2D and 3D)

  • Collision Check (3D)

  • Quantity Takeoff (3D)

  • Progress simulation (3D)

  • Permit Process

  • Requirements Management (GIS)

Permit to build
  • Permit to access
    (Plot management)
    (GIS)​

  • Preparatory measures
    (Archeology, Explosives,
    Forest, Environment)
    (GIS)​

Execution
  • Work management (GIS) ​

  • Progress Control (3D and GIS)

  • Measurements (GIS)​

  • Site Diary (GIS, 2D and 3D)​

  • Issue and Defect Management
    (GIS, 2D and 3D)​

Commissioning 
  • Testing & Commissioning (GIS, 2D and 3D)

  • Acceptance protocol

  • Warranties

  • Data extraction (3D)

  • Data enhancement (3D)

  • Requirements validation (GIS)

Handover to Operations
  • Asset Repository & BIM​

  • Data Linking between Assets and Documents​

  • As-Built Documentation as Export​

  • Constant update: As-Built versus As-Maintained​

Cross-phase
  • Contract Management​

  • Cost controlling​

  • Change management​

  • HSE

  • Document management​

  • Risk Management

  • Reporting & Analytics​

  • Stakeholder Management​

Thinkproject's SaaS solutions for Eastern Green Link

Thinkproject's solutions can serve as the digital backbone for Eastern Green Link, transforming complex construction objectives into streamlined processes, ensuring data accuracy, and fostering collaboration, ultimately contributing to the successful implementation of this substantial HVDC cable connection project from Scotland to England.

Northern Point of Connection
Constructing the Peterhead converter station and laying underground cabling to Sandford Bay: whether managing project schedules, monitoring progress, or handling document control, Thinkproject empowers you to navigate the complexities of the northern point of connection with ease.

Marine Cable Route
For the intricate subsea cable installation from Sandford Bay to Wilsthorpe, Thinkproject's software offers meticulous oversight. By digitizing documentation, managing supply chains, and optimizing processes, we ensure safe construction, minimize downtime, and protect the integrity of subsea cables.

Southern Point of Connection
As onshore underground cables connect Wilsthorpe to the new converter station in Drax, Thinkproject's Energy Solution continues to be your digital ally. Our solution facilitates the efficient tracking of cable installation, quality control, and safety measures.

  • Simplicity An information management system for
    Data, Processes, 3D Models, BIM, Geodata.
  • Integrated ProductsDigitizing and connecting the planning,
    construction and handover of converter 
    stations and cabling.
  • Task Management Gather, re-distribute, and link: as-designed
    data, as-built data, as-maintained data.
  • Quality Management Delivering on the full benefits of construction project digitalization.

Sound too good to be true? Try us!

Contact us

Learn more - Thinkproject Solutions


Thinkproject
More than software

Europe-based Thinkproject is a leading construction and engineering SaaS provider. Turning intelligence from data and over 20 years of industry expertise into an advantage for customers, it is at the forefront of the digitalization and transformation of the AECO industry. Thinkproject provides digital solutions enabling the management of asset lifecycles to:

Logo 1 Logo 2 Logo 3 Logo 4 Logo 5
  • 3.250 Customers with more than,
  • 300.000 Users in over,
  • 60 Countries, and
  • 75.000 Projects

Let's talk about Eastern Green Link

Kim Smedegaard Andersen
Deputy Technical Director

An integrated infrastructure information environment is an essential tool for engineers and project managers planning a project like the Fehmarnbelt Tunnel that connects Germany and Denmark. We have been working with Thinkproject satisfactorily and we have realised the benefits for this megaproject.